Print Back
Ceiling Mounted Workstation Cranes
Unit of Measure
1 2 3 

Product Code

Item Name

Runway Length

Maximum Hanger Spacing (L1)

Material

Price

GLC250-28-23 N/A Gorbel® 23 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 23 ft N/A 6 ft N/A steel $5,577.85
GLCS250-28-23 N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 23 ft N/A 20 ft N/A steel $6,966.43
GLCSL250-28-28 N/A Gorbel® 28 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 28 ft N/A 25 ft N/A steel $9,492.78
GLC250-28-33 N/A Gorbel® 33 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 33 ft N/A 6 ft N/A steel $6,932.27
GLCS250-28-33 N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 33 ft N/A 20 ft N/A steel $7,802.15
GLC250-28-43 N/A Gorbel® 43 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 43 ft N/A 6 ft N/A steel $8,290.98
GLCS250-28-43 N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 43 ft N/A 20 ft N/A steel $8,965.53
GLC250-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 53 ft N/A 6 ft N/A steel $10,219.63
GLCS250-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 53 ft N/A 20 ft N/A steel $10,532.36
GLCSL250-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 53 ft N/A 25 ft N/A steel $13,154.78
GLC250-28-63 N/A Gorbel® 63 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 63 ft N/A 6 ft N/A steel $10,631.63
GLCS250-28-63 N/A Gorbel® 63 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 63 ft N/A 20 ft N/A steel $11,768.33
GLCSL250-28-78 N/A Gorbel® 78 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 78 ft N/A 25 ft N/A steel {QUOTE}
GLC250-28-83 N/A Gorbel® 83 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 83 ft N/A 6 ft N/A steel {QUOTE}
GLCS250-28-83 N/A Gorbel® 83 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 83 ft N/A 20 ft N/A steel {QUOTE}
GLC250-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 103 ft N/A 6 ft N/A steel {QUOTE}
GLCS250-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 103 ft N/A 20 ft N/A steel {QUOTE}
GLCSL250-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 103 ft N/A 25 ft N/A steel {QUOTE}
AL250-28-23 N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 23 ft N/A 20 ft N/A Aluminum $9,810.85
AL250-28-33 N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 33 ft N/A 20 ft N/A Aluminum $11,363.81
AL250-28-43 N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 43 ft N/A 20 ft N/A Aluminum $12,852.73
AL250-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 53 ft N/A 20 ft N/A Aluminum $14,345.92
AL250-28-63 N/A Gorbel® 63 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 63 ft N/A 20 ft N/A Aluminum $15,825.23
AL250-28-83 N/A Gorbel® 83 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 83 ft N/A 20 ft N/A Aluminum {QUOTE}
AL250-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 250 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 103 ft N/A 20 ft N/A Aluminum {QUOTE}
GLC500-28-23 N/A Gorbel® 23 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 23 ft N/A 6 ft N/A steel $7,334.66
GLCS500-28-23 N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 23 ft N/A 20 ft N/A steel $8,423.33
GLCSL500-28-28 N/A Gorbel® 28 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 28 ft N/A 25 ft N/A steel $9,738.27
GLC500-28-33 N/A Gorbel® 33 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 33 ft N/A 6 ft N/A steel $9,084.00
GLCS500-28-33 N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 33 ft N/A 20 ft N/A steel $9,913.31
GLCSLX500-28-34 N/A Gorbel® 34 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 34 ft N/A 30 ft N/A steel $9,831.13
GLC500-28-43 N/A Gorbel® 43 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 43 ft N/A 6 ft N/A steel $10,220.70
GLCS500-28-43 N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 43 ft N/A 20 ft N/A steel $11,194.10
GLC500-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 53 ft N/A 6 ft N/A steel $11,591.15
GLCS500-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 53 ft N/A 20 ft N/A steel $12,599.77
GLCSL500-28-53 N/A Gorbel® 53 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 53 ft N/A 25 ft N/A steel $14,271.20
GLC500-28-63 N/A Gorbel® 63 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 63 ft N/A 6 ft N/A steel $13,043.78
GLCS500-28-63 N/A Gorbel® 63 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 63 ft N/A 20 ft N/A steel $13,817.59
GLCSLX500-28-64 N/A Gorbel® 64 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 64 ft N/A 30 ft N/A steel $14,382.20
GLCSL500-28-78 N/A Gorbel® 78 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 78 ft N/A 25 ft N/A steel {QUOTE}
GLC500-28-83 N/A Gorbel® 83 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 83 ft N/A 6 ft N/A steel {QUOTE}
GLCS500-28-83 N/A Gorbel® 83 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 83 ft N/A 20 ft N/A steel {QUOTE}
GLCSLX500-28-94 N/A Gorbel® 94 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 94 ft N/A 30 ft N/A steel {QUOTE}
GLC500-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 6 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 103 ft N/A 6 ft N/A steel {QUOTE}
GLCS500-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 103 ft N/A 20 ft N/A steel {QUOTE}
GLCSL500-28-103 N/A Gorbel® 103 Feet (ft) Runway Length, 25 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 103 ft N/A 25 ft N/A steel {QUOTE}
GLCSLX500-28-124 N/A Gorbel® 124 Feet (ft) Runway Length, 30 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Steel Ceiling Mounted Workstation Crane N/A 124 ft N/A 30 ft N/A steel {QUOTE}
AL500-28-23 N/A Gorbel® 23 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 23 ft N/A 20 ft N/A Aluminum $11,293.37
AL500-28-33 N/A Gorbel® 33 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 33 ft N/A 20 ft N/A Aluminum $13,194.27
AL500-28-43 N/A Gorbel® 43 Feet (ft) Runway Length, 20 Feet (ft) Maximum Hanger Spacing (L1), and 500 Pound (lb) Capacity Aluminum Ceiling Mounted Workstation Crane N/A 43 ft N/A 20 ft N/A Aluminum $15,056.75
Unit of Measure
1 2 3